The initial park provides a capacity of 200 MW whilst Sandrini II provides a potential of 100 MW. The whole expense of both equally projects weren't disclosed having said that, all through development, over two hundred workers have been employed. The initiatives are expected to see a handful of positions https://solarpanelsinstockton.blogspot.com/2024/10/what-are-benefits-of-installing-solar.html