The main park features a ability of two hundred MW while Sandrini II includes a capability of one hundred MW. The overall price of equally projects were not disclosed having said that, through construction, around two hundred personnel were used. The assignments are envisioned to determine A few positions opening https://berkeleysolarcompany.blogspot.com/2024/09/what-you-must-do-before-solar-roofing.html