Penmann has completed a significant HVAC upgrade at Danone Nutricia's Liverpool-based production site, providing a fully engineered ventilation and climate control system designed to satisfy demanding hygiene and production criteria. The scope included the complete lifecycle delivery of high-specification HVAC systems across non-production, Medium Care (MC) and High Care (HC) https://1001bookmarks.com/story20516550/penmann-finalises-major-hvac-upgrade-for-nutricia-s-production-facility-in-liverpool-in-line-with-fsi-phase-1-and-2